Edgbaston’s next phase combines a new hotel, a new stand and changes to the ground’s supporting infrastructure. Griffiths Evans’ appointment brings MEP design together with a client supervisory role and work on the relocation of floodlighting.
The challenge.
The new Radisson RED hotel is planned at the site of the existing Priory and Raglan stands. The development introduces hospitality accommodation alongside new spectator seating and relocates grounds-maintenance workshops beneath the hotel. The engineering needs to bring these different uses together within the stadium’s changing layout.
Our appointment.
Griffiths Evans is appointed for the full mechanical, electrical and public health design service from concept through to RIBA Stage 3, followed by a client supervisory role during construction and handover. Our stadium work also includes the relocation of floodlighting associated with the new development.


